[1]
|
Wang Xiao-Qing, Tang Jia-Fu. Cell management considering parts processed on machines in multiple cells based on scatter search approach. Chinese Journal of Mechanical Engineering, 2009, 45(10): 125-131 (王晓晴, 唐加福. 基于分散搜索的零部件跨单元生产的单元管理方法. 机械工程学报, 2009, 45(10): 125-131)[2] Jiang Yi-Wei, Wei Qi. An improved algorithm for a hybrid flow-shop problem in graphics processing. Acta Automatica Sinica, 2011, 37(11): 1381-1386 (蒋义伟, 魏麒. 图形处理中一类Flow-shop 问题的改进算法. 自动化学报, 2011, 37(11): 1381-1386[3] Yang W H, Liao C J. Group scheduling on two cells with intercell movement. Computers and Operations Research, 1996, 23(10): 997-1006[4] Garza O, Smunt T L. Countering the negative impact of intercell flow in cellular manufacturing. Journal of Operations Management, 1991, 10(1): 92-118[5] Solimanpur M, Vrat P, Shankar R. A heuristic to minimize makespan of cell scheduling problem. International Journal of Production Economics, 2004, 88(3): 231-241[6] Gholipour-Kanani Y, Tavakkoli-Moghaddam R, Khorrami A. Solving a multi-criteria group scheduling problem for a cellular manufacturing system by scatter search. Journal of the Chinese Institute of Industrial Engineers, 2011, 28(3): 192-205[7] Tang J F, Wang X Q, Kaku I, Yung K L. Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach. Journal of Intelligent Manufacturing, 2010, 21(4): 525-537[8] Elmi A, Solimanpur M, Topaloglu S, Elmi A. A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts. Computers and Industrial Engineering, 2011, 61(1): 171-178[9] Lin G Y J, Solberg J J. Effectiveness of flexible routing control. International Journal of Flexible Manufacturing Systems, 1991, 3(3-4): 189-211[10] Zhang Chang-Sheng, Sun Ji-Gui, Yang Qing-Yun, Zheng Li-Hui. A hybrid algorithm for flowshop scheduling problem. Acta Automatica Sinica, 2009, 35(3): 332-336 (张长胜, 孙吉贵, 杨轻云, 郑黎辉. 一种求解车间调度的混合算法. 自动化学报, 2009, 35(3): 332-336)[11] Xie Zhi-Qiang, Xin Yu, Yang Jing. Machine-driven integrated scheduling algorithm with rollback-preemptive. Acta Automatica Sinica, 2011, 37(11): 1332-1343 (谢志强, 辛宇, 杨静. 可回退抢占的设备驱动综合调度算法. 自动化学报, 2011, 37(11): 1332-1343)[12] Rajabinasab A, Mansour S. Dynamic flexible job shop scheduling with alternative process plans: an agent-based approach. The International Journal of Advanced Manufacturing Technology, 2011, 54(9-12): 1091-1107[13] Liu Min. A survey of data-based production scheduling methods. Acta Automatica Sinica, 2009, 35(6): 785-806 (刘民. 基于数据的生产过程调度方法研究综述. 自动化学报, 2009, 35(6): 785-806)
|