| [1] | Lopez L, Carter M W, Gendreau M. The hot strip mill production scheduling problem:a tabu search approach. European Journal of Operational Research, 1998, 106 (2-3):317-335 doi: 10.1016/S0377-2217(97)00277-4 |
| [2] | 吕志民, 徐金梧.一种适用于热送热装生产计划优化的方法.北京科技大学学报, 2002, 24 (6):675-678 http://www.cnki.com.cn/Article/CJFDTOTAL-BJKD200206023.htm Lv Zhi-Min, Xu Jin-Wu. Optimization method for hot charge rolling manufacture plan. Journal of University of Science and Technology Beijing, 2002, 24 (6):675-678 http://www.cnki.com.cn/Article/CJFDTOTAL-BJKD200206023.htm |
| [3] | Cowling P. A flexible decision support system for steel hot rolling mill scheduling. Computers and Industrial Engineering, 2003, 45(2):307-321 doi: 10.1016/S0360-8352(03)00038-X |
| [4] | Zhao J, Wang W, Liu Q L, Wang Z G, Shi P. A two-stage scheduling method for hot rolling and its application. Control Engineering Practice, 2009, 17 (6):629-641 doi: 10.1016/j.conengprac.2008.10.014 |
| [5] | Pan C C, Yang G K. A method of solving a large-scale rolling batch scheduling problem in steel production using a variant of column generation. Computers and Industrial Engineering, 2009, 56 (1):165-178 doi: 10.1016/j.cie.2008.05.001 |
| [6] | Lee H S, Murthy S S, Haider S W, Morse D V. Primary production scheduling at steelmaking industries. IBM Journal of Research and Development, 1996, 40 (2):231-252 doi: 10.1147/rd.402.0231 |
| [7] | Cowling P, Rezi W. Integration of continuous caster and hot strip mill planning for steel production. Journal of Scheduling, 2000, 3 (4):185-208 doi: 10.1002/(ISSN)1099-1425 |
| [8] | Tang L X, Liu J Y, Rong A Y, Yang Z H. A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research, 2001, 133 (1):1-20 doi: 10.1016/S0377-2217(00)00240-X |
| [9] | 吕志民, 牟文恒, 许剑桦, 唐荻, 徐金梧.两流方式下薄板坯连铸连轧生产组织方法及仿真.北京科技大学学报, 2005, 27 (3):356-359 http://www.cnki.com.cn/Article/CJFDTOTAL-BJKD200503025.htm Lv Zhi-Min, Mu Wen-Heng, Xu Jian-Hua, Tang Di, Xu Jin-Wu. Production organization method and simulation of dual-line thin slab continuous casting and hot rolling. Journal of University of Science and Technology Beijing, 2005, 27 (3):356-359 http://www.cnki.com.cn/Article/CJFDTOTAL-BJKD200503025.htm |
| [10] | 于港, 田乃媛, 徐安军, 贺东风.炼钢——热轧生产计划的优化与协调.冶金能源, 2009, 28 (4):6-9 http://www.cnki.com.cn/Article/CJFDTOTAL-YJLY200904003.htm Yu Gang, Tian Nai-Yuan, Xu An-Jun, He Dong-Feng. Optimization and coordination of steelmaking-hot rolling production plan. Energy for Metallurgical Industry, 2009, 28 (4):6-9 http://www.cnki.com.cn/Article/CJFDTOTAL-YJLY200904003.htm |
| [11] | 汪恭书, 唐立新.连铸——轧制生产中带有批决策的排序问题的建模与优化方法.自动化学报, 2012, 38 (10):1713-1720 http://www.aas.net.cn/CN/abstract/abstract17727.shtml Wang Gong-Shu, Tang Li-Xin. Modelling and optimization methods for the sequencing problem with batching decision in the continuous-casting and rolling production. Acta Automatica Sinica, 2012, 38 (10):1713-1720 http://www.aas.net.cn/CN/abstract/abstract17727.shtml |
| [12] | Chen Z L, Powell W B. Exact algorithms for scheduling multiple families of jobs on parallel machines. Naval Research Logistics, 2003, 50 (7):823-840 doi: 10.1002/(ISSN)1520-6750 |
| [13] | Tang L X, Wang G S, Liu J Y. A branch-and-price algorithm to solve the molten iron allocation problem in iron and steel industry. Computers and Operations Research, 2007, 34 (10):3001-3015 doi: 10.1016/j.cor.2005.11.010 |
| [14] | Dantzig G B, Wolfe P. Decomposition principle for linear programs. Operations Research, 1960, 8 (1):101-111 doi: 10.1287/opre.8.1.101 |
| [15] | Gilmore P C, Gomory R E. A linear programming approach to the cutting stock problem. Operations Research, 1961, 9 (6):849-859 doi: 10.1287/opre.9.6.849 |
| [16] | Desrochers M, Desrosiers J, Solomon M. A new optimization algorithm for the vehicle routing problem with time windows. Operations Research, 1992, 40 (2):342-354 doi: 10.1287/opre.40.2.342 |
| [17] | Moukrim A, Quilliot A, Toussaint H. An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration. European Journal of Operational Research, 2015, 244 (2):360-368 doi: 10.1016/j.ejor.2014.12.037 |
| [18] | Restrepo M I, Gendron B, Rousseau L M. Branch-and-price for personalized multiactivity tour scheduling. INFORMS Journal on Computing, 2016, 28 (2):334-350 doi: 10.1287/ijoc.2015.0683 |
| [19] | Fragkos I, Degraeve Z, De Reyck B. A horizon decomposition approach for the capacitated lot-sizing problem with setup times. INFORMS Journal on Computing, 2016, 28 (3):465-482 doi: 10.1287/ijoc.2016.0691 |
| [20] | Tang L X, Wang G S, Chen Z L. Integrated charge batching and casting width selection at baosteel. Operations Research, 2014, 62 (4):772-787 doi: 10.1287/opre.2014.1278 |
| [21] | Battarra M, Erdoǧan G, Vigo D. Exact algorithms for the clustered vehicle routing problem. Operations Research, 2014, 62 (1):58-71 doi: 10.1287/opre.2013.1227 |
| [22] | Baldacci R, Mingozzi A, Roberti R, Wolfler Calvo R. An exact algorithm for the two-echelon capacitated vehicle routing problem. Operations Research, 2013, 61 (2):298-314 doi: 10.1287/opre.1120.1153 |
| [23] | Fleszar K. An exact algorithm for the two-dimensional stage-unrestricted guillotine cutting/packing decision problem. INFORMS Journal on Computing, 2016, 28 (4):703-720 doi: 10.1287/ijoc.2016.0708 |
| [24] | Gschwind T, Irnich S. Dual inequalities for stabilized column generation revisited. INFORMS Journal on Computing, 2016, 28 (1):175-194 doi: 10.1287/ijoc.2015.0670 |
| [25] | Vanderbeck F. On Dantzig-Wolfe decomposition in integer programming and ways to perform branching in a branch-and-price algorithm. Operations Research, 2000, 48 (1):111-128 doi: 10.1287/opre.48.1.111.12453 |