[1] Zhou B H, Wang Z, Chen J. Scheduling method for single-arm cluster tools of wafer fabrications with residency and continuous reentrancy. Journal of Southeast University, 2013, 29(2):187-193 https://www.researchgate.net/publication/289783362_Scheduling_method_for_single-arm_cluster_tools_of_wafer_fabrications_with_residency_and_continuous_reentrancy
[2] Kim H J, Lee J H, Lee T E. Noncyclic scheduling of cluster tools with a branch and bound algorithm. IEEE Transactions on Automation Science and Engineering, 2015, 12(2):690-700 doi: 10.1109/TASE.2013.2293552
[3] Zhou B H, Gao Z S, Chen J. Scheduling algorithm of dual-armed cluster tools with residency time and reentrant constraints. Journal of Central South University, 2014, 21(1):160-166 doi: 10.1007/s11771-014-1927-2
[4] Geismar N, Dawande M, Sriskandarajah C. Productivity improvement from using machine buffers in dual-gripper cluster tools. IEEE Transactions on Automation Science and Engineering, 2011, 8(1):29-41 doi: 10.1109/TASE.2009.2039567
[5] 刘明祥, 周炳海. 基于时间约束集的集束型设备群调度方法. 自动化学报, 2012, 38(3):479-485 doi: 10.3724/SP.J.1004.2012.00479

Liu Ming-Xiang, Zhou Bing-Hai. Scheduling algorithm of multi-cluster tools based on time constraint sets. Acta Automatica Sinica, 2012, 38(3):479-485 doi: 10.3724/SP.J.1004.2012.00479
[6] Yoon H J, Lee Y D. Online scheduling of integrated single-wafer processing tools with temporal constraints. IEEE Transactions on Semiconductor Manufacturing, 2005, 18(4):390-398 https://www.researchgate.net/publication/3284176_Online_Scheduling_of_Integrated_Single-Wafer_Processing_Tools_With_Temporal_Constraints
[7] Perkinson T L, MacLarty P K, Gyurcsik R S, and Cavin R K. Single-wafer cluster tool performance:an analysis of throughput. IEEE Transactions on Semiconductor Manufacturing, 1994, 7(3):369-373 doi: 10.1109/66.311340
[8] Venkatesh S, Davenport R, Foxhoven P, Nulman J. A steady-state throughput analysis of cluster tools:dual-blade versus single-blade robots. IEEE Transactions on Semiconductor Manufacturing, 1997, 10(4):418-424 doi: 10.1109/66.641483
[9] Lim S Y, Park Y J, Lee H, Sun H. A real-time scheduling method for the cluster tool with wafer transfer delay. International Journal of Production Research, 2014, 52(4):934-946 doi: 10.1080/00207543.2013.808774
[10] Wu N Q, Chu C B, Chu F, Zhou M C. A petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints. IEEE Transactions on Semiconductor Manufacturing, 2008, 21(2):224-237 doi: 10.1109/TSM.2008.2000425
[11] Rostami S, Hamidzadeh B. Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints. IEEE Transactions on Semiconductor Manufacturing, 2002, 15(3):341-349 doi: 10.1109/TSM.2002.801379
[12] Zhou B H, Li X. Try and error-based scheduling algorithm for cluster tools of wafer fabrications with residency time constraints. Journal of Central South University, 2012, 19(1):187-192 doi: 10.1007/s11771-012-0990-9
[13] Rostami S, Hamidzadeh B. An optimal residency-aware scheduling technique for cluster tools with buffer module. IEEE Transactions on Semiconductor Manufacturing, 2004, 17(1):68-73 doi: 10.1109/TSM.2003.822725
[14] Ding S, Yi J, Zhang M T. Multicluster tools scheduling:an integrated event graph and network model approach. IEEE Transactions on Semiconductor Manufacturing, 2006, 19(3):339-351 doi: 10.1109/TSM.2006.879414
[15] Dawande M, Pinedo M, Sriskandarajah C. Multiple part-type production in robotic cells:equivalence of two real-world models. Manufacturing and Service Operations Management, 2009, 11(2):210-228 doi: 10.1287/msom.1070.0208
[16] Drobouchevitch I G, Geismar H N, Sriskandarajah C. Throughput optimization in robotic cells with input and output machine buffers:a comparative study of two key models. European Journal of Operational Research, 2010, 206(3):623-633 doi: 10.1016/j.ejor.2010.03.002